Cost: $4000
066157aa-bfba-49bd-9fd9-48c69b8d0fca

Project Status: Under Construction

LET’S CELEBRATE:

The Vanavewadi Village is now enjoying clean water thanks to NC Baptist!

Project Description:
Pipeline from Vanave Village to Vanavewadi Village site
Structure for 5,000 liter tank

5,000 liter tank
Gravity taps for public use

This project was phase 5 of 5 in a large clean water project in Khalapur area located outside Navi Mumbai. The first two phases provided the intake & pump at the river, the reverse osmosis water treatment plant, a tower & storage tanks. Phase three included a pipeline from Nimbode water plant to Dandwadi site, a structure for a 5,000 L. tank, 5,000 L. Tank, and gravity taps for public use. Phase 4 connected the clean water to the Kondhawadi village. Phase 5 of 5 connects clean water to the Vanavewadi village.

Rays of Hope has committed to provide the land, oversight of the project, and maintain the project for 10 years.